Aerial view of a runway on a green plateau

Integrated MRO City · KIAL Master Plan 2024

A 500-acre MRO City at Kannur.

Scaling from an initial 10-acre concept to the 500-acre MRO zone earmarked in KIAL's Master Plan (Drawing KIAL/MP-2024-001). It would be the first mega integrated MRO in North Kerala.

MRO zone
500 acres
Airport land
2,336 acres
Hangars
10 at full build
Build-out
60 months

Land allocation

Every acre has a purpose.

The MRO zone lies south-east of the runway with a direct connector taxiway. Hangars and the line apron sit closest to the airside; logistics, industry and the skill city sit behind them.

MRO zone · schematic, not to scale

  • Phase 1 · 0–18 mo
  • Phase 2 · 18–36 mo
  • Phase 3 · 36–60 mo
0725RWY 07/25 · 3,050 M · CONNECTOR TAXIWAY · MRO APRON (10 STANDS)Hangars 1–480 acPaint20 acEngine & QTA40 acComponents50 acLogistics City100 acOEM Industrial Park100 acSkill City40 acUtilities & Reserve70 ac

Hover or tap a zone to explore how the 500 acres are allocated.

Land allocation · acres

  • Bonded Warehouse & Logistics City100 ac

    Section 58 bonded stores, rotable pool and AOG desk.

  • Aerospace Industrial Park for OEMs100 ac

    Co-located OEM and MSME component shops.

  • Hangars 1–480 ac

    Wide- and narrow-body maintenance hangars on direct airside access.

  • Utilities, Green Buffer & Expansion70 ac

    Substation, STP, Cat-9 fire station, fuel farm and reserve land.

  • Component Workshops50 ac

    Avionics, landing-gear, hydraulic and NDT back-shops.

  • Engine Test Cell & QTA Shop40 ac

    30K lbf test cell sited downwind, plus quick-turn engine shop.

  • Training Academy & Skill City40 ac

    CAR-147 school, type-rating centre, VR labs, hostel for 200.

  • Paint Hangar20 ac

    Climate-controlled downdraft paint hangar for full livery work.

  • Total: 500 acres of the 2,336-acre airport.

Development phasing

Three phases, de-risked by design.

01

PHASE 01 · 0–18 months

Foundation

Land
100 ac
Capex
₹250 Cr
Revenue
₹40 Cr / yr
  • Hangars 1–2
  • Line maintenance
  • Bonded parts store
  • DGCA CAR-145 approval
02

PHASE 02 · 18–36 months

Heavy & Wide-body

Land
200 ac
Capex
₹400 Cr
Revenue
₹120 Cr / yr
  • Hangars 3–4 (wide-body)
  • Base maintenance
  • Component & avionics shops
  • Engine QTA · EASA / FAA
03

PHASE 03 · 36–60 months

Aerospace City

Land
200 ac
Capex
₹600 Cr
Revenue
₹300 Cr / yr
  • Paint hangar & test cell
  • Training academy
  • OEM industrial park & SEZ
  • P2F conversion line

₹1,250 Cr

Total capex, 500 acres

₹400 Cr

Revenue in year five

₹100 Cr

EBITDA in year five

22–26%

Benchmark project IRR

Master-plan figures are from the 500-acre technical R&D blueprint. Payback benchmark is 6–7 years (Kearney industry benchmark).

Site analysis

Airside access, without crossing the runway.

Direct airside access

The MRO zone sits south-east of the runway, beside the apron and served by a connector taxiway. Aircraft reach it without crossing the runway.

Separate MRO apron

A dedicated 10-aircraft apron, isolated from passenger traffic and beside the fuel farm and hydrant for engine runs.

Logistics next door

Close to the cargo terminal and the 180-acre industrial and logistics park, where OEMs such as Honeywell, Collins and Safran can set up shop.

Climate-ready engineering

Designed for 3,400 mm of annual rainfall and 35 ppt coastal salinity: corrosion coatings, flood drainage and a green buffer along the Kuppam River.

Aerial view of a runway threshold at sunset
Total airport land
2,336 acres
Runway
07/25 · 3,050 m × 45 m · CAT I ILS
Runway extension
To 4,000 m for B777 / B787
Elevation
330 ft AMSL
Rescue & firefighting
RFFS Category 9
Aircraft stands
20 (10 + 10 future), 24 apron bays planned
Cargo
18K TPA today, 60K TPA planned
Distance to Kannur town
28 km east

Utilities

Infrastructure that is already in place.

Power

KSEB 110 kV substation at Mattannur · 5 MW available

Water

Pazhassi dam, 10 km · 2 MLD required

Fuel

IOCL ATF facility at CNN · BPCL fuel-farm JV

Customs

24-hour customs notified · SEZ potential

Industrial land

200 acres notified industrial park

Connectivity

Ports, cluster and Gulf, all within reach.

Mangalore Port

2 hrs90 km

Kochi Port

6 hrs250 km

Bengaluru aerospace cluster

7 hrs300 km

GCC hubs

90 minBy air

Climate inputs: 23–34 °C, 70–90% humidity, 3,400 mm of annual rainfall and 35 ppt coastal salinity. These shape the corrosion protection, HVAC and drainage design.

Policy tailwinds

The economics have never been better.

India's new MRO policy, Kerala's aviation-hub vision and KIAL's PPP flexibility combine to make Kannur structurally competitive.

5%

GST on MRO services (from 18%), 0% within notified SEZ

0

Royalty under the new MRO policy (was 20–30%)

100%

FDI via the automatic route

₹100

Per acre land model at KIAL

Partner with ADR

Walk the airside with us.

Arrange a site visit to Kannur International Airport and a briefing on the master plan, phasing and land model.